Malfunctions and poor planning led to outages for 300,000 Israelis in temperatures of over 40°C, as inefficiency and red tape hinder expansion, optimization of power grid
Malfunctions and poor planning led to outages for 300,000 Israelis in temperatures of over 40°C, as inefficiency and red tape hinder expansion, optimization of power grid
Recent comments